Sculptural candles
When Does a Custom-Shaped Candle Need a New Mold?
By WeChic Candle Team · · 2 min read
The ribbed tree shown below has an existing mold. If you only want to change the wax color, we can use the existing mold. If you want a different height or a different texture molded into the wax, we need to make a new mold.

Three ways to change the ribbed tree
| Your request | How we quote it |
|---|---|
| “Make the tree in burgundy.” | Existing mold. Send a color reference and check the shade on a wax sample before approving the batch. |
| “Make it taller to suit our holiday display.” | New mold. Give the finished height from the base to the tip of the wax, excluding the wick. |
| “Keep the height but make the ribs wider.” | New mold. Mark the grooves on a close-up and show how wide or deep you want them. |
For an existing freestanding shape, the minimum is 50 candles per design. For an existing container candle, count 50 per vessel and wax-shape combination. A new wax mold starts at 500 candles per design. Tooling and custom samples are quoted for the project. Compare both order routes.
What to mark on your reference photo




What to send for a wholesale quote
Send a marked photo, the number of finished candles you need per design, the delivery country and postal code, and your target arrival date. For a color change, name the shade and the quantity in each color. For a new mold, add a side view or sketch with the target measurements. Ask for the mold fee and sample cost as separate lines so you can compare both routes.
What to settle before tooling starts
Mark narrow tips and deep grooves on the drawing and give the width of the base. Ask the factory to check where the wax could catch during demolding, which details could break during handling and whether the finished candle stands steadily.
Request separate dates for mold making, the first wax sample and bulk production after approval. If you expect a repeat order, ask who owns and stores the mold, how long it will be kept, and what reuse, repair or replacement would cost. Record those terms with the approved design revision.